Waste incinerator "KVA Trimmis" (Switzerland)
Assembly of a flue-gas scrubber and flue-gas ducting, delivery and assembly of pipework system in Polypropylene (PP), Polyvinylchloride (PVC), GFK, stainless steel 1.4571 (V4A) and 1.0038 (S235JRG2 - RSt 37-2)
Total assembly time: 9.800hrs.
|
 |
Electro-plating plant for the company "SACHS-BOGE" (Mexico)
Delivery and assembly of a complete exhaust air purification plant: atmospheric evaporator in Polyvinylidenfluoride (PVDF), 2-stage absorption plant in
Polyvinylchloride (PVC), radial ventilator of Polyvinylchloride (PVC) steel impeller (rubberized), exhaust air pipework system in Polyvinylchloride (PVC)
and Polyethylene (PE), pipework system for fluids in Polyvinylidenfluoride (PVDF)
|
 |
 |
 |
Waste incinerator "Vattenfall Värme Uppsala" (Sweden)
Delivery and assembly of pipework system in Polypropylene (PP) and GFK
Total assembly time: 3.500hrs.
|
 |
"Waste Treatment Center Hannover" (Germany)
Delivery and assembly of the whole exhaust air plant in the area for biological treatment of residual waste, exhaust air volume flow V = 165.000 m³/h, radial ventilators in stainless steel 1.4301 (V2A), pipework system (partly earth-laid) in Polyethylene (PE) and Polypropylene (PP)
Total assembly time: 6.000hrs.
|
 |
 |
 |
Electro-plating plant for the company "Shanghai Sachs Huizhong Shock Absorber" (China)
Delivery and assembly of 2 complete exhaust air purification plants: atmospheric evaporator in Polyvinylidenfluoride (PVDF),
2-stage absorption plant in Polyvinylchloride (PVC), radial ventilator in Polyvinylchloride (PVC) with steel impeller (rubberized),
exhaust air pipework system in Polyvinylchloride (PVC) and Polyethylene (PE), pipework system for fluids in Polyvinylidenfluoride (PVDF)
|
 |
Radial ventilators for a steelworks in Peking (China)
Delivery of 2 radial ventilators with a volume flow of 22.000 m³/h and pressure increase of 3.400 Pa, material: PP (GFK-reinforced), as well as 2 radial
ventilator with a volume flow of 36.000 m³/h and a pressure increase of 17.500 Pa, material: steel (rubberized)
|
 |
 |
 |
Electro-plating plant for the company "SAAZ" (Russia)
Delivery and assembly of a complete exhaust air purification plant: atmospheric evaporator in Polyvinylidenfluoride (PVDF), 2-stage absorption plant of
Polyvinylchloride (PVC), radial ventilator of Polyvinylchloride (PVC) with steel impeller (rubberized), exhaust air pipework in Polyvinylchloride (PVC) and
Polyethylene (PE), pipework system for fluids of Polyvinylidenfluoride (PVDF)
|
 |
Electro-plating plant for the company GROHE (Germany)
Delivery and assembly of a horizontal counter-flow scrubber in Polyvinylchloride (PVC), exhaust air volume flow V = 36.000 m³/h,
including adapting of the available pipework system.
|
 |